WORKSHOP
WORKBOOK
HISTORY

Revision Details 
(Look here only if you need to know exactly what has changed)

Revision #13
(January 2, 2008)

Revision #12
(May 6, 2008)

Revision #11
(January 1, 2007)

Revision #10
(January 10, 2006)

Revision #9
(December 22, 2004)

Revision #8
(May 14, 2004)

Revision #7
(April 16, 2004)

Revision #6
(April 26, 2003)

Revision #5
(February 18, 2003)

Revision #4
(December 4, 2002)

Revision #3
(September 14, 2002)

Revision #2
(September 4, 2002)

Revision #1
(March 1, 2002)

 



CURRENT POWERPOINT SLIDE SHOWSlide Show First Slide
RBA 101 Powerpoint Version 1.8
This is the same Powerpoint slide show used in FPSI workshops.

NOTE: This is the actual Powerpoint slide show,
NOT the file from which to print handout materials.
See Section A on this page for handout materials.)

Results Accountability 101
the 20 Minute Powerpoint Version

for use when presentation time is severely limited.

 

The following FPSI handout and presentation material can be printed from Adobe Acrobat files. This material is updated periodically, and updated pages will be noted in the Chronological Listing of Website Additions and Changes. (accessible from here or from the "What's New" page).

 

 

A. Results Accountability 101 Workshop Handout Material:

USE THIS FOR WORKSHOP HANDOUT MATERIAL.

 

A1 Workshop Workbook version 1.9  (53 pages) This is a pdf document compilation of the Powerpoint slides used in the RBA 101 Workshop plus other full page materials referenced in the workshop. Last revision January 2, 2009

A2 Results Accountability Brochure (2 pages)
All  the basic ideas on two just pages. This may be printed in black and white or color.

 

B. Alternate Workshop Handout Material

(Please do not use for FPSI workshops without prior discussion.)

 

B1 Alternative Workshop Workbook version 1.9  (44 pages) This is an optional subset of the 101 Workbook pages, when printing the whole thing is just too much. PLEASE DON'T COPY THIS  FOR WORKSHOPS without first discussing workshop plans with FPSI. Last revision January 2, 2009.

B2 Alternative Workshop Workbook for Education version 1.9  (52 pages) This is an optional subset of the 101 Workbook pages for use with training for educators. PLEASE DON'T COPY THIS  FOR WORKSHOPS without first discussing workshop plans with FPSI. Last revision February 10, 2010.

B3 101 Workshop: A Few Selected Pages version 1.9 (29 pages) A minimal subset of the 101 Workbook pages, when printing the whole thing is just too much. PLEASE DON'T COPY THIS  FOR WORKSHOPS without first discussing workshop plans with FPSI. Last revision January 2, 2009.

B4 101 Workshop: Key Pages version 1.9 (10 pages) The bare minimum subset of the 101 Workbook. PLEASE DON'T COPY THIS  FOR WORKSHOPS without first discussing workshop plans with FPSI. Last revision January 2, 2009.

B5 Decisiones y Presupuestos Basados en Resultados y Rendimientos: Materiales de Trabajo Si Ud. tiene algún comentario, por favor envielo a pzuluagar@yahoo.com Estamos trabajando para encontrar un vocabulario que sea "entendible" a todos los hispano-parlantes. Material de "Responsabilidad con los Resultados," Libro de trabajo 101. Traducido por Patricia Zuluagar. Gracia Patricia!  Revised and updated April 24, 2003

 

 

C. Additional Material

(Please do not use for FPSI workshops without prior discussion.)

 

C1. San Mateo County Budget 2002 2003 Selected pages (25 pages) This is an excellent example of performance budgeting. COPY this for workshops when possible. 

C2. Hennepin County Budget 2002 Selected pages (15 pages) This is an excellent example of results budgeting at the population and cross system level. COPY this for workshops when possible.

C3. Getting to Results, Building a Prototype for Results-Based Accountability™ in Maryland: Excerpt from Maryland 2001 Kids Count Factbook, by Phil Lee, University of Maryland School of Public Affairs - An excellent example of Legislative and Executive Branch leadership in developing a results accountability system, including the first legislative results budget hearing. Thanks to Advocates for Children and Youth and the Annie E. Casey Foundation. 

D. Additional overheads
(approx 40 pages) PLEASE  DO NOT COPY THIS MATERIAL FOR THE WORKSHOP without first discussing workshop plans with FPSI..

Last revision Jan 2, 2002.

 

 

  • These are overheads and formats which didn't make it into the main workbook but may still be useful in presenting the ideas of Results Accountability. Still more examples of performance measures can be found at www.raguide.org under questions 3.10 and 3.11.

  • This additional material is presented in two parts. Part 1 provides additional examples of performance measures for a wide range of programs and services. Part 2 is a collection of charts and graphics developed over the years which might be of some use to somebody sometime. You can scan through this and print the pages you like. But be warned that this is a little like rummaging through someone's attic. Hope you find something useful.



The Web RAguide.org

 

 

1997 - 2010 by FPSI Mark Friedman
All Rights Reserved